Built on the Westside.
Every project here was permitted, inspected, and finished on schedule. Ask us for references from any of them.

Mar Vista kitchen
Curved white oak, marble backsplash · 9 weeks
Westchester primary bath
Walk-in shower, floating vanity · 5 weeks
Culver City ADU
Open kitchen and living, 640 sq ft · 7 months
Venice guest bath
Checkerboard tile, vintage fixtures · 4 weeksMar Vista kitchen
- Timeline
- 9 weeks
- Budget
- $92,000
Removed a load-bearing wall to open the kitchen to the dining room, then built curved white-oak cabinetry and a marble backsplash.
Westchester primary bath
- Timeline
- 5 weeks
- Budget
- $48,000
Converted a tub alcove into a curbless walk-in shower with a linear drain, heated floors, and a floating double vanity.
Culver City ADU
- Timeline
- 7 months
- Budget
- $285,000
A permitted 640 sq ft detached unit with a full kitchen, one bedroom, and its own entrance and utility meters.
Venice guest bath
- Timeline
- 4 weeks
- Budget
- $31,000
A playful checkerboard floor, vintage-style fixtures, and a new window for natural light in a 1940s bungalow.
Reviews
From our clients
Rated 4.9 across Google, Yelp, and Houzz.
★★★★★
“They converted our garage into an ADU on time and on budget. The weekly photo updates made it stress-free.”Tom & Rachel H.Mar Vista · ADU
★★★★★
“Our kitchen looks incredible. The crew was respectful and cleaned up every single day.”Nina P.Westchester · Kitchen
★★★★★
“Honest pricing and no surprise change orders. We've already hired them again for the bathroom.”Greg A.Culver City · Bathroom